Testing and commissioning
As part of the project, we verify the correctness of electrical installation work, the correct installation and functionality of switchboards, data cables, as well as the correct installation of devices and their functionality. We also check other similar aspects to ensure that everything meets the required standards and norms.
System testing and subsequent commissioning are also critical phases in the software development life cycle. These steps include thorough testing of every aspect of the software to detect errors, ensure proper operation, and verify that it meets requirements. An important part is also verifying the correct interaction between different parts of the system, as well as testing the system from the end users' point of view. Subsequently, the system starts up into normal operation.
These steps are necessary to ensure the quality, safety and successful operation of the system in a real environment.